DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP OMSKAYA TPP-3 OMSKAYA TPP-3 OMSKAYA TPP-3 OMSKAYA TPP-3 TOBOLSKAYA HPP TOBOLSKAYA HPP TOBOLSKAYA HPP TOBOLSKAYA HPP TROITSKAYA SDPP TROITSKAYA SDPP TROITSKAYA SDPP TROITSKAYA SDPP TYUMENSKAYA HPP-1 TYUMENSKAYA HPP-1 TYUMENSKAYA HPP-1 TYUMENSKAYA HPP-1 CHELYABINSKAYA HPP-3 CHELYABINSKAYA HPP-3 CHELYABINSKAYA HPP-3 CHELYABINSKAYA HPP-3 DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP

Troitskaya GRES

65%
Construction of pulverized coal power unit with the rated capacity of 660 MW at Troitskaya SDPP
 
Implementation date: 2014
Customer: JSC "ОGK-2"
General contractor: LSS "Guartz-New Technologies"
Main equipment:
  • steam turbine CLN-660-24.2/566/566 manufactured by Harbin Turbine Plant;
  • steam Boiler HG-2100/25,4-YM manufactured by Harbin Boiler Plant;
  • generator QFSN-660-2 manufactured by Harbin Generator Plant.
Scope of works provided by Quartz-New Technologies LLC as part of the project:
  • complete range of surveying and design works (including the detailed desing);
  • supply of the main and auxiliary equipment;
  • dismounting and preparatory works;
  • construction, mounting and special works on the main construction facilities;
  • start and commissioning works;
  • warranty service.
Engineering and economical performance
Stats
Capacity of the implemented power unit
660 MW
Installed capacity of the power unit*
2879 MW
Estimated annual power output
4620 million KW´h
Fuel type
Coal
Annual reference fuel consumption
1281,588*103  trf
Efficiency (gross)
42 %
UCF
0.798
SRFC
292г/кВтч
*сonsidering the launch of a new unit