DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP OMSKAYA TPP-3 OMSKAYA TPP-3 OMSKAYA TPP-3 OMSKAYA TPP-3 TOBOLSKAYA HPP TOBOLSKAYA HPP TOBOLSKAYA HPP TOBOLSKAYA HPP TROITSKAYA SDPP TROITSKAYA SDPP TROITSKAYA SDPP TROITSKAYA SDPP TYUMENSKAYA HPP-1 TYUMENSKAYA HPP-1 TYUMENSKAYA HPP-1 TYUMENSKAYA HPP-1 CHELYABINSKAYA HPP-3 CHELYABINSKAYA HPP-3 CHELYABINSKAYA HPP-3 CHELYABINSKAYA HPP-3 DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP DZHUBGINSKAYA TPP

Omskaya TPP-3

100%
detailed engineering design work;
dismantling, installation and construction work;
delivery of accessories;
Poland (commissioning);
warranty service.
Construction of turnkey combined cycle power unit 90 MW at the Omsk CHPP-3
 
Implementation date: 2013
Customer: JSC "TGK-11"
General contractor: OJSC "QUARTZ-New Technologies"
Main equipment:
  • two GTU-type LM2500+G4 DLE nominal electric capacity 31,14 MW manufactured by General Electric;
  • two steam recovery boilers type E-38,8/8.87-55/6,3-500/230 horizontal profile of production of JSC ''EMAlliance'', Taganrog;
  • one of the cogeneration steam turbine type T-14/23-4.5/0.18 nominal electrical capacity of 6,900 MW (in condensing mode) produced by OJSC ''Kaluga turbine factory'', Kaluga.
Scope of works provided by OJSC ''QUARTZ-New Technologies'' as part of the project:
  • detailed engineering design work;
  • dismantling, installation and construction work;
  • delivery of accessories;
  • poland (commissioning).
Engineering and economical performance
Stats
Capacity of the implemented power unit
85,2 MW
Installed capacity of the power unit*
435,2 MW
Estimated annual power output
511,2 million KW´h
Fuel type
Natural gas
Efficiency (gross)
49,5 %
UCF
0.69
SRFC
207,31г/кВтч
*сonsidering the launch of a new unit